View Project
The Unitarian Universalist Fellowship was in need of a wheelchair ramp in order
to access their new building. The existing conditions were dangerous due to the
uneven stair height. Also, there was no way for the physically handicapped to enter
the building.
|
|
View Project
Ogletree Elementary School was in need of some new sidewalks, sidewalk extensions,
and bench pads.
|
|
View Project
The purpose of this project was to research experimental pervious concrete and replace
a conventional sidewalk with one that was pervious. Also, this group looked into
developing new ways to place experimental concrete.
|
|
View Project
The Athletic School at Auburn University needed a retaining wall to prevent further
mud damage to the batting cages at the women's softbll complex. The wall connects
to a series of other retaining walls and stands about waist high.
|
|
View Project
East Alabama Aids Outreach needed some sidewalks poured, as well as a 3-car parking
lot and a short driveway. Most of the formwork was curved.
|
|
View Project
Auburn High School needed a slab on grade that would keep storm run-off out of an
adjacent storage shed. The slab is 30' x 18'.
|
|
View Project
This project was done in conjunction with the one below. Drake Middle School wanted
to connect the new 6th grade annex with a 6' wide sidewalk. They ended up needing
some stairs as well.
|
|
View Project
This group constructed the side walk that connects to the stairs in the project
above.
|