






Production
The student-designed DESIGNhabitat 2 home went into production April 18th in Palm Harbor Home's plant in Boaz, AL and was shipped to the home site in Greensboro, AL the following week. Under the direction of Hinson and Norman, the architecture students responsible for the design then began a two-week "blitz build" to complete the site-built components of the home. The keys to the DESIGNhabitat 2 House were turned over to Dorinda Crews and her three children on June 23rd, 2006.