22.10.07 update.
things have been going pretty well lately. we got everthing done last week we were hoping to get accomplished and we should be in good position to get everything ready to pour the slab this weekend. at this point we have the majority of the formwork up and we laid out the vapor barrier as well as the insulation and wire mesh. we spent the rest of the week getting drawings and things together because we weren’t going to be able to pour until this weekend.
everything looks pretty good for us to be ready to pour on saturday. john will be gone becuase it is his mom’s birthday, so we will be one down over the weekend. this week we need to lay the radiant floor tubing as well as level and straighten all the formwork. from here we have to make some decisions on whether to go ahead with framing or push to finish the rest of the concrete work which is the basketball court and front driveway.
here are some time lapse footage of us getting ready for the slab pour. enjoy.