Another Wednesday

To correct Christine’s blog, Sarah, Golpar, Chris and I did not rake sand in the fields. We hog-tied the lower edge of the chain link fence to the tension wire that ran between the posts and tied the top of the chain link to the horizontal top posts. I also cut off the excess fence post from the dugouts. A rake never came in contact with my hands. Also, Fuller and Erin sat at a table by themselves. It was hardly ‘the cool table’. Other than that though, it’s not too inaccurate of a recollection of the day for someone that overslept and skipped out on a hard days worth of work


As for Wednesday, besides the usual studio work on CAD and Sketch-Up, the real highlight of the day was when the internet began working again. The previous day was brought to a grinding halt due to the lack of internet, making it impossible to access the server and download programs to work on the Pig Roast video and Power Point presentations that Cameron, Candace and I are working on.

Cameron and Erin were sent off to help at Lyon’s Park where Erin was reunited with Nathan and Cameron missed out on registering for classes. Luckily Tammy knows how to take care of us and registered her for all of the classes that she needed.


Leave a Reply »»

Note: You must be registered and logged in to leave a comment: